Properties for Implementation
نوع: محتوى تعليمي
Properties for Implementation
General Predecessors Resources Custom Columns
Add Delete
ID Task name Type Delay Link hardness
0 Prototyping Finish-Start 0 Strong
Finish-Start
Finish-Finish
Start-Finish
Start-Start
Ok Cancel
Gantt Project Interface
نوع: محتوى تعليمي
Gantt Resources Chart
Zoom In Zoom Out Project start Past Future
2023
Name Begin date End date
Problem definition 4/4/23 4/6/23
Research and analysis 4/6/23 4/16/23
Concept generation 4/17/23 4/23/23
Design selected 4/20/23 4/20/23
Design development 4/20/23 5/9/23
Design developed 5/10/23 5/10/23
Prototyping 5/16/23 5/18/23
Implementation 5/16/23 5/22/23
Product implemented 5/25/23 5/25/23
Project closure 5/25/23 5/28/23
Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22
3/26/23 4/2/23 4/9/23 4/16/23 4/23/23 4/30/23 5/7/23 5/14/23 5/21/23 5/28/23
Design selected
Design developed
Product im
يمكنك أن تلاحظ الاختلاف بين العلاقات.
شكل 1.34: إضافة العلاقات بين المهام
نوع: FIGURE_REFERENCE
شكل 1.34: إضافة العلاقات بين المهام
Footer
نوع: METADATA
Cloud: disconnected
وزارة التعليم
Ministry of Education
2023 - 1447
Page Number
نوع: METADATA
76
🔍 عناصر مرئية
Properties for Implementation
A modal dialog box titled 'Properties for Implementation' with a close button (X) in the top right. It contains four tabs: 'General', 'Predecessors', 'Resources', and 'Custom Columns'. The 'Predecessors' tab is currently active. Within this tab, there is a table with columns 'ID', 'Task name', 'Type', 'Delay', and 'Link hardness'. Below the table headers, there are 'Add' and 'Delete' buttons. One row of data is visible: '0' in 'ID', 'Prototyping' in 'Task name', 'Finish-Start' selected in the 'Type' dropdown, '0' in 'Delay', and 'Strong' in 'Link hardness'. The 'Type' dropdown is open, showing options: 'Finish-Start', 'Finish-Finish', 'Start-Finish', and 'Start-Start'. At the bottom of the dialog, there are 'Ok' and 'Cancel' buttons.
Gantt Project
A Gantt chart interface for 'Gantt Project' software, displaying a project schedule for the year 2023. The interface includes a toolbar with icons for 'Gantt', 'Resources Chart', 'Zoom In', 'Zoom Out', 'Project start', and 'Past Future'. The main area is divided into two panes: a left pane listing tasks with their 'Name', 'Begin date', and 'End date', and a right pane showing a timeline with task bars and dependency arrows. The timeline spans from Week 13 (March 26, 2023) to Week 22 (May 28, 2023). A blue text bubble on the right side of the chart states: 'يمكنك أن تلاحظ الاختلاف بين العلاقات.' (You can notice the difference between relationships.).
📄 النص الكامل للصفحة
--- SECTION: Properties for Implementation ---
Properties for Implementation General Predecessors Resources Custom Columns Add Delete ID Task name Type Delay Link hardness
0 Prototyping Finish-Start 0 Strong Finish-Start Finish-Finish Start-Finish Start-Start Ok Cancel--- SECTION: Gantt Project Interface ---
Gantt Resources Chart Zoom In Zoom Out Project start Past Future Name Begin date End date Problem definition 4/4/23 4/6/23
Research and analysis 4/6/23 4/16/23
Concept generation 4/17/23 4/23/23
Design selected 4/20/23 4/20/23
Design development 4/20/23 5/9/23
Design developed 5/10/23 5/10/23
Prototyping 5/16/23 5/18/23
Implementation 5/16/23 5/22/23
Product implemented 5/25/23 5/25/23
Project closure 5/25/23 5/28/23
Week 13 Week 14 Week 15 Week 16 Week 17 Week 18 Week 19 Week 20 Week 21 Week 22
3/26/23 4/2/23 4/9/23 4/16/23 4/23/23 4/30/23 5/7/23 5/14/23 5/21/23 5/28/23
Design selected Design developed Product im
يمكنك أن تلاحظ الاختلاف بين العلاقات.--- SECTION: شكل 1.34: إضافة العلاقات بين المهام --- شكل 1.34: إضافة العلاقات بين المهام--- SECTION: Footer ---
Cloud: disconnected2023 - 1447--- SECTION: Page Number ------ VISUAL CONTEXT ---
**DIALOG**: Properties for Implementation Description: A modal dialog box titled 'Properties for Implementation' with a close button (X) in the top right. It contains four tabs: 'General', 'Predecessors', 'Resources', and 'Custom Columns'. The 'Predecessors' tab is currently active. Within this tab, there is a table with columns 'ID', 'Task name', 'Type', 'Delay', and 'Link hardness'. Below the table headers, there are 'Add' and 'Delete' buttons. One row of data is visible: '0' in 'ID', 'Prototyping' in 'Task name', 'Finish-Start' selected in the 'Type' dropdown, '0' in 'Delay', and 'Strong' in 'Link hardness'. The 'Type' dropdown is open, showing options: 'Finish-Start', 'Finish-Finish', 'Start-Finish', and 'Start-Start'. At the bottom of the dialog, there are 'Ok' and 'Cancel' buttons.
Table Structure:
Headers: ID | Task name | Type | Delay | Link hardness Rows:
Row 1: 0 | Prototyping | Finish-Start | 0 | Strong Calculation needed: N/A Data: N/A Key Values: Task: Prototyping, Dependency Type: Finish-Start, Delay: 0, Link Hardness: Strong, Available Types: Finish-Start, Finish-Finish, Start-Finish, Start-Start Context: This dialog demonstrates how to configure task dependencies (predecessors) for a specific task ('Implementation') in a project management tool, showing various types of relationships and their parameters.**CHART**: Gantt Project Description: A Gantt chart interface for 'Gantt Project' software, displaying a project schedule for the year 2023. The interface includes a toolbar with icons for 'Gantt', 'Resources Chart', 'Zoom In', 'Zoom Out', 'Project start', and 'Past Future'. The main area is divided into two panes: a left pane listing tasks with their 'Name', 'Begin date', and 'End date', and a right pane showing a timeline with task bars and dependency arrows. The timeline spans from Week 13 (March 26, 2023) to Week 22 (May 28, 2023). A blue text bubble on the right side of the chart states: 'يمكنك أن تلاحظ الاختلاف بين العلاقات.' (You can notice the difference between relationships.).
X-axis: Timeline (Weeks/Dates)
Y-axis: Task Name Data: The left pane lists 10 tasks: 'Problem definition' (4/4/23 - 4/6/23), 'Research and analysis' (4/6/23 - 4/16/23), 'Concept generation' (4/17/23 - 4/23/23), 'Design selected' (4/20/23 - 4/20/23), 'Design development' (4/20/23 - 5/9/23), 'Design developed' (5/10/23 - 5/10/23), 'Prototyping' (5/16/23 - 5/18/23), 'Implementation' (5/16/23 - 5/22/23), 'Product implemented' (5/25/23 - 5/25/23), and 'Project closure' (5/25/23 - 5/28/23). The right pane visually represents these tasks as horizontal blue bars on a weekly timeline. Arrows connect the end of one task bar to the start of another, indicating dependencies. For example, 'Prototyping' is linked to 'Implementation'. The 'Implementation' task is highlighted, suggesting it's the task being modified in the overlaying dialog.
Key Values: Problem definition: 4/4/23 - 4/6/23, Research and analysis: 4/6/23 - 4/16/23, Concept generation: 4/17/23 - 4/23/23, Design selected: 4/20/23 - 4/20/23, Design development: 4/20/23 - 5/9/23, Design developed: 5/10/23 - 5/10/23, Prototyping: 5/16/23 - 5/18/23, Implementation: 5/16/23 - 5/22/23, Product implemented: 5/25/23 - 5/25/23, Project closure: 5/25/23 - 5/28/23, Timeline: Week 13 (3/26/23) to Week 22 (5/28/23)
Context: This Gantt chart provides a visual representation of a project schedule, demonstrating how tasks are organized, their durations, and the sequential relationships (dependencies) between them, which are crucial for project planning and execution.
🎴 بطاقات تعليمية للمراجعة
عدد البطاقات: 5 بطاقة لهذه الصفحة
ما هي أنواع العلاقات (التبعيات) بين المهام في برنامج إدارة المشاريع كما تظهر في نافذة 'Properties for Implementation'؟
الإجابة: الأنواع هي: Finish-Start، Finish-Finish، Start-Finish، و Start-Start.
الشرح: هذه الأنواع الأربعة تمثل الطرق الأساسية لربط المهام ببعضها البعض في مخطط جانت، حيث تحدد العلاقة بين بداية أو نهاية مهمة مع بداية أو نهاية المهمة التابعة لها.
تلميح: انظر إلى القائمة المنسدلة في عمود 'Type' في الجدول.
التصنيف: تعريف | المستوى: متوسط
ما هو نوع العلاقة (Type) المحدد للمهمة 'Prototyping' في نموذج إعداد التبعيات؟ وما هي صلابة الرابط (Link hardness)؟
الإجابة: النوع المحدد هو 'Finish-Start' وصلابة الرابط هي 'Strong'.
الشرح: هذا يعني أن المهمة 'Prototyping' يجب أن تنتهي أولاً (Finish) قبل أن تبدأ المهمة التابعة لها (Start)، وأن هذا الرابط قوي (Strong) ولا يمكن كسره بسهولة.
تلميح: ركز على الصف الوحيد الظاهر في جدول 'Predecessors'.
التصنيف: رقم/تاريخ | المستوى: سهل
اذكر ثلاث مهام رئيسية من مرحلة التصميم في مخطط جانت المعروض، مع تواريخ بدايتها ونهايتها.
الإجابة: 1. تصميم المختار (Design selected): 20/4/23 - 20/4/23. 2. تطوير التصميم (Design development): 20/4/23 - 9/5/23. 3. التصميم المطور (Design developed): 10/5/23 - 10/5/23.
الشرح: توضح هذه المهام التسلسل المنطقي في مرحلة التصميم، بدءاً من اختيار التصميم، ثم تطويره، وانتهاءً بالحصول على التصميم المطور النهائي.
تلميح: ابحث في قائمة المهام عن الكلمات التي تبدأ بـ 'Design'.
التصنيف: ملخص | المستوى: متوسط
ما هي المهام التي تبدأ في تاريخ 16/5/23 وفقاً لمخطط جانت؟
الإجابة: المهمتان اللتان تبدآن في 16/5/23 هما: بناء النموذج الأولي (Prototyping) والتنفيذ (Implementation).
الشرح: يشير هذا إلى أن مرحلتي بناء النموذج الأولي والتنفيذ يمكن أن تتمان بشكل متوازي أو متداخل في الوقت نفسه، وهو أمر شائع في إدارة المشاريع.
تلميح: اقرأ عمود 'Begin date' للعثور على التاريخ المطلوب.
التصنيف: رقم/تاريخ | المستوى: سهل
ما هو الهدف من نافذة 'Properties for Implementation' في برنامج إدارة المشاريع كما هو موضح في الصفحة؟
الإجابة: الهدف هو تكوين تبعيات المهام (Predecessors) لمهمة محددة (مثل 'Implementation')، من خلال تحديد المهمة السابقة، ونوع العلاقة، والتأخير، وصلابة الرابط.
الشرح: تسمح هذه النافذة للمستخدم بتحديد كيفية ارتباط المهام ببعضها البعض، وهو أمر أساسي لإنشاء جدول زمني منطقي ودقيق في مخطط جانت.
تلميح: فكر في وظيفة الألسنة (Tabs) الأربعة داخل النافذة، وخاصة لسان 'Predecessors' النشط.
التصنيف: مفهوم جوهري | المستوى: صعب