لتغيير أولوية المهمة
نوع: محتوى تعليمي
لتغيير أولوية المهمة
Instruction 1
نوع: محتوى تعليمي
اضغط بزر الفأرة الأيمن على المهمة التي تريدها، ثم اضغط على خيار Task Properties (خصائص المهمة). 1
Instruction 2
نوع: محتوى تعليمي
غير أولوية المهمة من خلال الاختيار من قائمة Priority (الأولوية) المنسدلة. 2
Instruction 3
نوع: محتوى تعليمي
اضغط على Ok (موافق). 3
شكل 1.29
نوع: FIGURE_REFERENCE
شكل 1.29: تغيير أولوية المهمة
Ministry of Education Info
نوع: METADATA
وزارة التعليم Ministry of Education 2023 - 1447
Page Number
نوع: METADATA
70
🔍 عناصر مرئية
شكل 1.29: تغيير أولوية المهمة
A screenshot of a project management software interface, likely GanttProject, demonstrating how to change the priority of a task. The image is divided into two main parts: a Gantt chart view at the top and a 'Properties for Research and analysis' dialog box at the bottom. The Gantt chart shows various tasks, their start/end dates, and durations represented by horizontal bars across a timeline (Week 14 to Week 22 in 2023). A right-click context menu is open on a task, highlighting 'Task Properties...'. The dialog box shows detailed properties for a task named 'Research and analysis', with tabs for 'General', 'Predecessors', 'Resources', and 'Custom Columns'. The 'General' tab is active, displaying fields like 'Name', 'Milestone', 'Scheduling options', 'Begin date', 'End date', 'Duration', 'Earliest begin', 'Priority', 'Progress', 'Show in timeline', 'Shape', 'Colors', and 'Web Link'. The 'Priority' dropdown list is open, showing options 'Normal', 'Lowest', 'Low', 'Normal', 'High', 'Highest', with 'High' currently selected. The dialog box also has 'Ok' and 'Cancel' buttons at the bottom.
📄 النص الكامل للصفحة
--- SECTION: لتغيير أولوية المهمة --- لتغيير أولوية المهمة--- SECTION: Instruction 1 --- اضغط بزر الفأرة الأيمن على المهمة التي تريدها، ثم اضغط على خيار Task Properties (خصائص المهمة). 1--- SECTION: Instruction 2 --- غير أولوية المهمة من خلال الاختيار من قائمة Priority (الأولوية) المنسدلة. 2--- SECTION: Instruction 3 --- اضغط على Ok (موافق). 3--- SECTION: شكل 1.29 --- شكل 1.29: تغيير أولوية المهمة--- SECTION: Page Number ------ VISUAL CONTEXT ---
**FIGURE**: شكل 1.29: تغيير أولوية المهمة
Description: A screenshot of a project management software interface, likely GanttProject, demonstrating how to change the priority of a task. The image is divided into two main parts: a Gantt chart view at the top and a 'Properties for Research and analysis' dialog box at the bottom. The Gantt chart shows various tasks, their start/end dates, and durations represented by horizontal bars across a timeline (Week 14 to Week 22 in 2023). A right-click context menu is open on a task, highlighting 'Task Properties...'. The dialog box shows detailed properties for a task named 'Research and analysis', with tabs for 'General', 'Predecessors', 'Resources', and 'Custom Columns'. The 'General' tab is active, displaying fields like 'Name', 'Milestone', 'Scheduling options', 'Begin date', 'End date', 'Duration', 'Earliest begin', 'Priority', 'Progress', 'Show in timeline', 'Shape', 'Colors', and 'Web Link'. The 'Priority' dropdown list is open, showing options 'Normal', 'Lowest', 'Low', 'Normal', 'High', 'Highest', with 'High' currently selected. The dialog box also has 'Ok' and 'Cancel' buttons at the bottom.
X-axis: EMPTY Y-axis: EMPTY Data: EMPTY Key Values: Gantt Resources Chart, Zoom In, Zoom Out, Project start, Past Future, Show critical path, Baselines, Gantt project, 2023, Name, Begin date, End date, Problem definition, 4/4/23, 4/9/23, Concept generation, Concept selection, Design development, Prototyping, Evaluation and testing, Design optimization, Implementation, Project closure, New task, Task Properties..., Unindent, Indent, Up, Down, Copy, Cut, Paste, Delete Task, Assignments, Week 14 (4/10/23), Week 15 (4/17/23), Week 16 (4/24/23), Week 17 (5/1/23), Week 18 (5/8/23), Week 19 (5/15/23), Week 20 (5/22/23), Week 21 (5/29/23), Week 22 (6/5/23), Properties for Research and analysis, General, Predecessors, Resources, Custom Columns, Name: Research and analysis, Milestone, Scheduling options: in this dialog, Begin date: April 6, 2023, End date: April 18, 2023, Duration: 7, Earliest begin, April 4, 2023, Copy begin date, Priority: High (dropdown options: Normal, Lowest, Low, Normal, High, Highest), Progress, Show in timeline, Shape, Colors: Choose... Default, Web Link, Edit Notes..., Warning, Errors, Ok, Cancel Context: This figure illustrates the procedural steps for modifying task priority within a project management software, as detailed in the accompanying instructions. It visually demonstrates the user interface elements involved in accessing task properties and selecting a new priority level.
🎴 بطاقات تعليمية للمراجعة
عدد البطاقات: 5 بطاقة لهذه الصفحة
ما هي الخطوات الثلاث لتغيير أولوية مهمة في برنامج إدارة المشاريع كما وردت في الصفحة؟
الإجابة: 1. اضغط بزر الفأرة الأيمن على المهمة التي تريدها، ثم اضغط على خيار Task Properties (خصائص المهمة). 2. غير أولوية المهمة من خلال الاختيار من قائمة Priority (الأولوية) المنسدلة. 3. اضغط على Ok (موافق).
الشرح: هذه هي الخطوات الإجرائية الأساسية لتعديل أولوية المهمة في برامج إدارة المشاريع، وهي خطوات متسلسلة ومنطقية تبدأ بفتح خصائص المهمة ثم تعديل الأولوية ثم حفظ التغييرات.
تلميح: تتضمن العملية ثلاث إجراءات متتالية تبدأ بالنقر بزر الفأرة الأيمن وتنتهي بالضغط على زر التأكيد.
التصنيف: صيغة/خطوات | المستوى: سهل
ما هو الإجراء الأول الذي يجب تنفيذه لتغيير أولوية مهمة في برنامج إدارة المشاريع؟
الإجابة: الضغط بزر الفأرة الأيمن على المهمة التي تريدها، ثم الضغط على خيار Task Properties (خصائص المهمة).
الشرح: هذه هي الخطوة الأولى والأساسية للوصول إلى إعدادات المهمة وتعديل خصائصها بما فيها الأولوية.
تلميح: يبدأ الإجراء بتفاعل مع المهمة نفسها باستخدام زر معين في الفأرة.
التصنيف: صيغة/خطوات | المستوى: سهل
كيف يتم تغيير مستوى أولوية المهمة بعد فتح خصائصها؟
الإجابة: عن طريق الاختيار من قائمة Priority (الأولوية) المنسدلة.
الشرح: قائمة الأولوية المنسدلة هي الوسيلة الرئيسية لتحديد مستوى الأهمية النسبية للمهمة ضمن المشروع.
تلميح: يتم التعديل من خلال عنصر واجهة مستخدم يظهر كقائمة يمكن فتحها.
التصنيف: صيغة/خطوات | المستوى: سهل
ما هو الإجراء النهائي لتأكيد تغيير أولوية المهمة؟
الإجابة: الضغط على زر Ok (موافق).
الشرح: زر الموافق هو الوسيلة القياسية في واجهات المستخدم لحفظ التغييرات وتطبيقها على المهمة.
تلميح: هو الإجراء الذي يحفظ التغييرات ويغلق نافذة الخصائص.
التصنيف: صيغة/خطوات | المستوى: سهل
ما هي الخطوات الثلاث لتغيير أولوية مهمة في برنامج إدارة المشاريع كما وردت في الصفحة؟
الإجابة: 1. اضغط بزر الفأرة الأيمن على المهمة التي تريدها، ثم اضغط على خيار Task Properties (خصائص المهمة). 2. غير أولوية المهمة من خلال الاختيار من قائمة Priority (الأولوية) المنسدلة. 3. اضغط على Ok (موافق).
الشرح: هذه الخطوات تمثل إجراءً تقنياً أساسياً في برامج إدارة المشاريع لتعديل مستوى أولوية المهام، وهو أمر مهم في تخطيط وتنفيذ المشاريع الهندسية.
تلميح: تتضمن العملية ثلاث إجراءات متسلسلة تبدأ بالوصول إلى خصائص المهمة وتنتهي بتأكيد التغيير.
التصنيف: صيغة/خطوات | المستوى: سهل